Progress, slow but constant
Work on the LS Connectors continues. As does the sewing. The ITMG is progressing nicely as I add details where ever I can. I have the last two gas connectors started. Here is a picture of the completed connectors as well as the electrical connector and both the pressure relief valve and the UD valve.
These all will have to be anodized befor they are installed.



Popularity: unranked [?]
Categories: Uncategorized
Recent Comments